Production Expansion
Factory Building 4
Enhancing Production Capabilities for
Aluminium Die Casting

Seishin (Thailand) Co., Ltd. has expanded its production capacity with the development of Factory Building 4 to support the growing requirements of the industrial sector.

Overview
Production Capacity Expansion Overview

Factory Building 4 was developed to enhance the company's production capabilities. Covering more than 1,800 square metres, the facility supports aluminium die casting operations and production support systems, strengthening our readiness to meet evolving industry requirements.

Floor Area
1,800+
Die Casting Machines
4
Machines
Production Support Systems
Ready
for Continuous Production
Key Highlight
1,250 tons
Aluminium Die Casting Machine
For Large Components

Factory Building 4 is equipped with a 1,250-ton aluminium die casting machine to support the production of large components, together with additional die casting machines of other capacities to accommodate a wide range of production requirements.

Large Components
Supports Larger Part Sizes
Advanced Technology
Advanced Die Casting Technology
Flexible Production
Wide Range of Applications
Production Workflow
Integrated Production Workflow

The production flow within Factory Building 4 is designed for systematic and continuous operation, from receiving molten aluminium tanks through to the finishing process.

1. Molten Aluminium Receiving
Tank Delivery & Receiving
2. Storage
Molten Aluminium Tank Holding Area
3. Die Casting
Aluminium Die Casting Process
4. Finishing
Part Finishing Process
Production Support Systems
Integrated Production Support Systems

The facility is equipped with cooling, water supply, compressed air, and machine utility systems to support stable and continuous production operations.

Cooling System
Process Cooling
Water Supply
Process Water System
Compressed Air
Air Supply System
Machine Utilities
Machine Support Systems
Energy Efficiency & Sustainability
Efficient Energy Use

Factory Building 4 is also equipped with a rooftop solar PV system to help reduce reliance on grid electricity while supporting more energy-efficient and sustainable operations.

Reduced Grid Electricity Reliance
Lower Grid Power Dependency
Supports Sustainability
Sustainable Operations
Optimised Energy Use
Energy Efficiency
Future Readiness
Ready to Meet Future Industry Demands

With Factory Building 4, Seishin (Thailand) Co., Ltd. continues to strengthen its manufacturing processes, advance production technology and deliver high-quality aluminium die cast parts, reinforcing the confidence of our industrial partners.